Validate the dynamic scheduling configuration

After creating a dynamic scheduling configuration, validate the configuration to ensure that works as intended.

Before you begin

Role required: admin

About this task

After creating or modifying a dynamic scheduling configuration, click the Validate config related link to validate the settings. If the configuration is valid, an informational message appears at the top of the Dynamic Scheduling Configuration form.